Engineering Projects Under Construction

Print
Press Enter to show all options, press Tab go to next option

Resurfacing 2019-01

As part of the Town’s annual paving priorities, staff evaluated the local roadways and determined priority areas in need of maintenance. The segments in this project primarily consist of VVTA bus routes that have not been resurfaced during recent projects.  The Project generally consists of providing necessary labor, equipment and materials for the application of Cape Seal and Micro surface on local roads totaling approximately 15 miles within the Town of Apple Valley.