Resurfacing 2019-02

The Project generally consists of providing necessary labor, equipment and materials for the application of micro surface on various streets within the Town of Apple Valley, installing new thermoplastic striping , and installing detectable warning surfaces on ADA ramps.  As part of the Town’s annual paving priorities, staff evaluated local roadways and determined priority areas in need of maintenance. The segments in this project primarily consist of residential and collector roads throughout the Town of Apple Valley. 

Tentative Completion:  October 2019


Apple Valley Desert Water Reuse Project

This project includes converting the source of irrigation water at four locations from potable water to reclaimed water from the Apple Valley Water Reclamation Plant and retrofitting the existing irrigation system at each site to utilize reclaimed water.  Irrigating with reclaimed water will reduce the use of potable groundwater and the demand on the stressed Mojave River Groundwater Basin.  The locations included in the project are the Apple Valley Golf Course, Brewster Park, Thunderbird Park, and Civic Center Park.

Projected Completion: March 2020